The new Hoover Dam Bypass Bridge is almost 2,000 feet long. It’s supporting arch was started on each side of the Colorado River canyon. To create a perfect curve the two sides had to meet within one inch of each other.

Can you imagine the painstaking engineering and labor intensive work that went into making that meeting possible?

If we are going to build bridges between each other we must be willing to put in the thought and work necessary to make it happen.